FY25 H1 ORDER BOOK $38.2 B / NEW MANDATE · ATLANTA TRANSIT CORRIDOR $2.1 B / SAFETY · 487 DAYS LTI-FREE · GULF COAST OPS / SBTi NET-ZERO TARGETS VALIDATED · 2024 / GROUNDBREAKING · RED SEA LINK PHASE II / NYSE WPX $127.40 ▲ / ADVANCED COMPOSITE WPX-C7 CERTIFIED ASTM C1202 / FY25 H1 ORDER BOOK $38.2 B / NEW MANDATE · ATLANTA TRANSIT CORRIDOR $2.1 B / SAFETY · 487 DAYS LTI-FREE · GULF COAST OPS / SBTi NET-ZERO TARGETS VALIDATED · 2024 / GROUNDBREAKING · RED SEA LINK PHASE II / NYSE WPX $127.40 ▲ / ADVANCED COMPOSITE WPX-C7 CERTIFIED ASTM C1202 /
WEPEX

FY 2025 — Annual Report   Group HQ · New York, NY   Founded 1976

We build the
infrastructure
the world depends on.

Energy corridors, transit systems, port terminals, water networks and the critical backbone that keeps nations running. Wepex Group is a global engineering and infrastructure firm employing 38,000 professionals — delivering projects that define generations.

$24.7B

Group revenueFY24

38,000

Employees26 countries

1,870

Active projects

49yr

In continuous operation

Gulf Coast Energy Terminal — Phase III
29.763° N   95.374° W
01 / Featured · Operational 2025

Gulf Coast Energy Terminal — Phase III — A 3.8 GW integrated energy and desalination complex, 22 km offshore Texas.

§ 01 — At a glance

Wepex Group was founded in 1976 with a single port redevelopment contract in Houston, Texas. Forty-nine years later, our people operate across six continents — from the deepwater terminals of the Gulf Coast to the high-speed rail corridors of East Asia, the desalination plants of the Arabian Peninsula, and the transmission grids of Northern Europe.

Listed

New York Stock Exchange

Ticker

NYSE: WPX

Rating

BBB+ stable (S&P)

Auditor

Deloitte & Touche

Reporting · US GAAP · SASB aligned

§ 04 — In the field

See how we build.

From factory floor to open ocean, our teams deliver precision engineering across every discipline. These are not renders — this is work in progress.

Precision at scale

01 / MODULAR CONSTRUCTION

Precision at scale

Off-site fabrication of structural modules reduces on-site labour by 40% and cuts programme duration by up to six months. Every module is digitally twinned before it leaves the factory floor.

The next generation of concrete

02 / MATERIALS INNOVATION

The next generation of concrete

Our proprietary WPX-C7 blend uses 68% recycled aggregate and achieves 8,000 psi compressive strength with 22% lower embedded carbon than ASTM C1202 baseline. Certified across 19 jurisdictions.

Engineering without compromise

03 / STEEL & HEAVY LIFT

Engineering without compromise

From deep-water jacket foundations to 12,800-tonne crane vessel lifts, our steel fabrication and marine installation teams deliver the structures that hold the world's energy transition together.

Sustainability

Group decarbonisation programme   SBTi · TCFD · EU Taxonomy

From a heavy industry to a measured one.

We track every tonne of CO₂e against every dollar of revenue, in every contract, every quarter, since 2009. The full ledger is open to our shareholders, our regulators and our future.

Scope 1 + 2 + 3   Audited by DeloitteOpen ledger →
Climate report 2025

Embedded CO₂ — tonnes / $M revenue

2009 → 2025   ▼ 57%

2009
2013
2017
2022
2025

on track for −70% by 2030

§ 04 — Group, in numbers

The hard figures from FY24 — audited, US GAAP-prepared, and reconcilable to every press release we've issued since our NYSE listing in 1998.

$24.7B

Group revenue▲ 6.8% YoY · constant FX

$38.2B

Order book · H1 25▲ 12.1% vs FY24

8.4%

Adjusted EBIT margin▲ 50 bps

−57%

Embedded CO₂ / $M rev.since 2009

0.38

LTI rate / 200k hrsvs sector mean 1.7