FY25 H1 ORDER BOOK $38.2 B / NEW MANDATE · ATLANTA TRANSIT CORRIDOR $2.1 B / SAFETY · 487 DAYS LTI-FREE · GULF COAST OPS / SBTi NET-ZERO TARGETS VALIDATED · 2024 / GROUNDBREAKING · RED SEA LINK PHASE II / NYSE WPX $127.40 ▲ / WPX-C7 COMPOSITE CERTIFIED ASTM C1202 / FY25 H1 ORDER BOOK $38.2 B / NEW MANDATE · ATLANTA TRANSIT CORRIDOR $2.1 B / SAFETY · 487 DAYS LTI-FREE · GULF COAST OPS / SBTi NET-ZERO TARGETS VALIDATED · 2024 / GROUNDBREAKING · RED SEA LINK PHASE II / NYSE WPX $127.40 ▲ / WPX-C7 COMPOSITE CERTIFIED ASTM C1202 /
WEPEX

§ 02 — Heritage

Hospital de Sant Pau — Pavilion 04

Modernist masonry stabilisation across nine pavilions. UNESCO listed since 1997.

Hospital de Sant Pau — Pavilion 04

Client

Hospital de la Santa Creu i Sant Pau

Contract value

€67 M

Duration

2021 – 2026

Location

41.404°N 2.174°E

The Hospital de Sant Pau is a masterpiece of Catalan Modernisme, designed by Lluís Domènech i Montaner in 1902. UNESCO-listed since 1997, the complex comprises 12 pavilions connected by underground service tunnels, each featuring extraordinary tilework, stained glass, and sculptural brickwork.

Wepex Heritage was contracted for the stabilisation and modern services integration of Pavilion 04 — the former surgery block. The project required hand-laser cleaning of 4,200 ceramic tiles, structural reinforcement of the brick vaults using carbon-fibre wrapping, and the insertion of modern HVAC, fire suppression, and data cabling through heritage corridors without visible intervention.

Every intervention was approved by the Catalan Heritage Council and documented using photogrammetric surveys with 0.5 mm resolution. The project serves as a reference case for UNESCO on the integration of modern building services in Grade I listed structures.

UNESCO

Listing

1902

Built

Project scope

Structural stabilisation
Ceramic tile restoration
Carbon-fibre vault reinforcement
Heritage HVAC integration
Photogrammetric documentation